Historical data We hold no recent measurements for this stop. The most recent month with data is December 2024. The figures below remain valid for the period they name.
Vullierens, Abbaye
Stop 8510538 · Vullierens · VD
This figure covers every line that calls here, taken together — a long-distance train and a town bus in one number. We measured what that costs: the line you actually travel on sits 1.88 percentage points from this figure on average. It is the only pooling of this kind we allow.
Timetable period 2025
The published figure is the most recently completed timetable period. The current one is below it as a trend — month by month, and never folded into a single figure: nothing is averaged across a timetable change.
December 8, 2024 – December 13, 2025
82.35% — less than 3:00 late, coverage 94.44% (floor 90%)
| Threshold | Share | Coverage | Stop events counted |
|---|---|---|---|
| under 3:00 | 82.35% | 94.44% | 17 |
| under 5:00 | 94.12% | 94.44% | 17 |
| under 15:00 | 100% | 94.44% | 17 |
Distribution of delays
| Measure | Value (min:s) |
|---|---|
| Median | 1:41 |
| 90th percentile | 4:50 |
| 95th percentile | 5:31 |
| Measured arrivals | 17 |
The 3:00 threshold can see none of what happens beyond it: nine arrivals in ten are under 4:50.
Cancellations and early departures
| Measure | Share | Coverage |
|---|---|---|
| Ran rather than cancelled | 100% | 94.44% |
| Departures not early | 99.38% | 94.44% |
An early departure is one more than a minute ahead of the timetable. It has its own denominator — measured departures — because sharing the arrivals' one would make it depend on how many origin stops an operator has.
What this figure is made of
Three disclosures travel with every number on this page. For some operators they are not decoration — they are the whole finding.
| Disclosure | Share | What it means |
|---|---|---|
| Confirmed | 0% | The share of counted arrivals for which an arrival event fired (REAL). The rest is a forecast — which says something about a stop's equipment, not about whether the vehicle came. |
| Restated as timetable | 5.56% | The share of what could have been measured that was removed because the forecast was the scheduled second exactly. A denominator that lost a fifth of itself is a different statement from one that lost nothing. |
| Confirmed and exactly on plan | nothing measured | The share of confirmed arrivals filed at exactly the scheduled second. Disclosed and deliberately not removed: no rule in this project reaches this case. |
Only 8 of the 11 months in this period carry figures. The figure above is counted over those 8 and not over the whole period.
The months inside this period
The figure above is counted over the whole period. A single month inside it can have quite different coverage — and one that is below the floor on its own disappears into a period figure that clears it.
| Month | Share | Coverage | Confirmed | Restated as timetable | Confirmed and exactly on plan |
|---|---|---|---|---|---|
| January 2025 | not published | nothing measured | nothing measured | nothing measured | nothing measured |
| February 2025 | not published | nothing measured | nothing measured | nothing measured | nothing measured |
| March 2025 | not published | nothing measured | nothing measured | nothing measured | nothing measured |
| April 2025 | not published | nothing measured | nothing measured | nothing measured | nothing measured |
| May 2025 | not published | nothing measured | nothing measured | nothing measured | nothing measured |
| June 2025 | not published | nothing measured | nothing measured | nothing measured | nothing measured |
| October 2025 | not published | nothing measured | nothing measured | nothing measured | nothing measured |
| November 2025 | not published | nothing measured | nothing measured | nothing measured | nothing measured |
Rows with no share are below the 90% floor on their own. The figure above stands: it is measured over the whole period and it clears the floor. Both are true, and only one of them used to be on this page.
Nothing was reported at this stop in these months: July 2025, August 2025, September 2025
Trend — Timetable period 2026
The current timetable period, month by month. Each month is counted on its own; these rows do not add up to the figure above and are not meant to.
| Month | Share | Coverage | Confirmed | Restated as timetable | Confirmed and exactly on plan |
|---|---|---|---|---|---|
| January 2026 | not published | nothing measured | nothing measured | nothing measured | nothing measured |
| February 2026 | not published | nothing measured | nothing measured | nothing measured | nothing measured |
| March 2026 | not published | nothing measured | nothing measured | nothing measured | nothing measured |
| April 2026 | not published | nothing measured | nothing measured | nothing measured | nothing measured |
| May 2026 | not published | nothing measured | nothing measured | nothing measured | nothing measured |
| June 2026 | not published | nothing measured | nothing measured | nothing measured | nothing measured |
| August 2026 | not published | nothing measured | nothing measured | nothing measured | nothing measured |
| September 2026 | not published | nothing measured | nothing measured | nothing measured | nothing measured |
Every row carries its own coverage. A month below the floor publishes no share — the three columns on the right still say why.
Nothing was reported at this stop in these months: July 2026
Not measured yet — these months are after the archive's most recent one: October 2026, November 2026
By hour of day
Over the last 365 days in the archive, not the timetable year above — so the grid shows the hours as they run now.
October 1, 2025 – September 30, 2026
No hour in this period has enough behind it to publish.
About this stop
| Stop number | 8510538 |
|---|---|
| Municipality | Vullierens |
| Canton | VD |
| Country code | ch |
The station is measured as a whole: every edge and platform together. An individual edge has no figure of its own here.
Source and method
Source of the measurements: opentransportdata.swiss (istdaten). How we measure is written up in the methodology.
A figure is published only from 90% coverage upward. Below it there is no figure here — not a greyed-out one, not a dash, none.