Skip to contentBePünktli

211 (Corseaux, Gonelles – Blonay, gare)

Line 85:876:211 · Transports publics Vevey-Montreux-Chillon-Villeneuve · bus


Timetable period 2025

The published figure is the most recently completed timetable period. The current one is below it as a trend — month by month, and never folded into a single figure: nothing is averaged across a timetable change.

December 8, 2024 – December 13, 2025

85.43% — less than 3:00 late, coverage 99.03% (floor 90%)

ThresholdShareCoverageStop events counted
under 3:0085.43%99.03%199'420
under 5:0094.76%99.03%199'420
under 15:0099.67%99.03%199'420

Distribution of delays

MeasureValue (min:s)
Median0:59
90th percentile3:40
95th percentile5:04
Measured arrivals199'246

The 3:00 threshold can see none of what happens beyond it: nine arrivals in ten are under 3:40.

Cancellations and early departures

MeasureShareCoverage
Ran rather than cancelled99.91%99.03%
Departures not early99.34%99.03%

An early departure is one more than a minute ahead of the timetable. It has its own denominator — measured departures — because sharing the arrivals' one would make it depend on how many origin stops an operator has.

What this figure is made of

Three disclosures travel with every number on this page. For some operators they are not decoration — they are the whole finding.

DisclosureShareWhat it means
Confirmed97.27%The share of counted arrivals for which an arrival event fired (REAL). The rest is a forecast — which says something about a stop's equipment, not about whether the vehicle came.
Restated as timetable0.62%The share of what could have been measured that was removed because the forecast was the scheduled second exactly. A denominator that lost a fifth of itself is a different statement from one that lost nothing.
Confirmed and exactly on plan1.16%The share of confirmed arrivals filed at exactly the scheduled second. Disclosed and deliberately not removed: no rule in this project reaches this case.

Only 10 of the 11 months in this period carry figures. The figure above is counted over those 10 and not over the whole period.

The months inside this period

The figure above is counted over the whole period. A single month inside it can have quite different coverage — and one that is below the floor on its own disappears into a period figure that clears it.

MonthShareCoverageConfirmedRestated as timetableConfirmed and exactly on plan
January 202589.1%98.47%98.01%1.54%1.24%
February 202592.43%99.27%97.25%0.73%1.48%
March 202589.2%98.08%98.05%0.84%1.27%
April 202589.79%99.81%99.17%0.02%1.14%
May 202582.42%99.79%94.79%0.21%1.03%
June 202582.87%97.13%94.64%0.77%1.17%
July 202586.53%98.85%94.91%0.58%1.09%
August 202581.56%99.64%95.04%0.1%1.05%
October 202583.61%99.73%99.59%0.2%1.02%
November 202575.04%99.82%99.19%0.04%0.97%

Rows with no share are below the 90% floor on their own. The figure above stands: it is measured over the whole period and it clears the floor. Both are true, and only one of them used to be on this page.

Nothing was reported under this line key in these months: September 2025

Trend — Timetable period 2026

The current timetable period, month by month. Each month is counted on its own; these rows do not add up to the figure above and are not meant to.

MonthShareCoverageConfirmedRestated as timetableConfirmed and exactly on plan
January 202682.06%97.38%97.71%2.47%1.32%
February 202682.38%95.47%98.14%0.4%1.27%
March 202679.73%99.44%97.63%0.21%1.31%
April 202682.94%99.19%97.66%0.12%1.5%
May 202674.9%98.35%96.95%0.75%1.09%
June 202677.05%98.81%97.76%1.04%1.12%
July 202687.98%98.51%98.73%1.41%1.58%
August 202682.86%99.59%98.6%0.05%1.39%
September 202677.95%99.05%99.16%0.12%1.21%

Every row carries its own coverage. A month below the floor publishes no share — the three columns on the right still say why.

Not measured yet — these months are after the archive's most recent one: October 2026, November 2026

By hour of day

When an hour starts decides more about punctuality than almost anything else measured here.

Over the last 365 days in the archive, not the timetable year above — so the grid shows the hours as they run now.

October 1, 2025 – September 30, 2026

HourMonTueWedThuFriSatSunStop events counted
05:0098.56%97.07%96.75%96.88%98.85%nothing measurednothing measured3'967
06:0098.55%97.03%97.31%97.49%98.02%97.19%97.19%47'378
07:0086.57%84.08%85.44%85.23%90.54%98.49%98.15%54'001
08:0073.34%65.29%71.35%67.13%77.89%97.68%96.97%49'700
09:0089.23%84.17%85.28%78.83%84.01%89.75%97.63%32'398
10:0079.96%67.53%73.38%63.57%66.27%71.29%93.72%32'572
11:0075.97%69.72%72.54%67.2%69.34%67.55%91.25%32'679
12:0072.96%72.41%67.39%65.91%70.58%78.88%96.24%32'275
13:0083.83%81.77%82.13%78.61%80.53%86.84%94.05%31'659
14:0086.65%83.48%78.54%83.98%78.99%87.68%92.72%32'369
15:0082.35%83.11%78.05%79.36%73.58%88.19%92.5%34'433
16:0080.08%79.1%79.03%75.98%75.74%87.74%90.95%53'391
17:0072.87%67.8%67.29%65.5%71.91%80.29%85.6%55'308
18:0079.29%74.95%73.38%73.32%70.75%91.4%88.63%56'728
19:0091.58%88.49%87.65%83.88%79.53%91.83%96.28%45'272
20:0091.84%89.38%85.27%85.93%78.82%88.59%95.85%31'332
21:0087.36%83.45%81.37%84.04%77.66%73.56%96.84%24'806
22:0085.75%76.68%79.45%82.15%69.74%82.35%nothing measured14'082
23:0094.51%89.64%93.28%90.15%88.45%85.6%nothing measured14'077
00:00 (+1)too few measurementstoo few measurementstoo few measurementstoo few measurementstoo few measurementstoo few measurementsnothing measured673

The outlined cell is that day’s worst hour — it is not the same hour on every day.

Service day, not calendar day: hour 24 is 00:00–00:59 the following morning and still belongs to the day before.

An hour's coverage is the measurement axis alone. The figure at the top of this page takes the worst of three axes — days, journeys, measurements — and so rests on more evidence than these rows do.

About this line

Line key85:876:211
Label211
OperatorTransports publics Vevey-Montreux-Chillon-Villeneuve
Modebus

The line registry is built from one week of June 2026. Lines that did not run in that week have no name here — they are measured all the same.

Source and method

Source of the measurements: opentransportdata.swiss (istdaten). How we measure is written up in the methodology.

A figure is published only from 90% coverage upward. Below it there is no figure here — not a greyed-out one, not a dash, none.