Skip to contentBePünktli

202 (Vevey, Charmontey – Vevey, Pra)

Line 85:876:202 · Transports publics Vevey-Montreux-Chillon-Villeneuve · bus


Timetable period 2025

The published figure is the most recently completed timetable period. The current one is below it as a trend — month by month, and never folded into a single figure: nothing is averaged across a timetable change.

December 8, 2024 – December 13, 2025

82.92% — less than 3:00 late, coverage 99.12% (floor 90%)

ThresholdShareCoverageStop events counted
under 3:0082.92%99.12%816'662
under 5:0094.44%99.12%816'662
under 15:0099.86%99.12%816'662

Distribution of delays

MeasureValue (min:s)
Median1:07
90th percentile3:56
95th percentile5:09
Measured arrivals815'944

The 3:00 threshold can see none of what happens beyond it: nine arrivals in ten are under 3:56.

Cancellations and early departures

MeasureShareCoverage
Ran rather than cancelled99.91%99.12%
Departures not early99.21%99.12%

An early departure is one more than a minute ahead of the timetable. It has its own denominator — measured departures — because sharing the arrivals' one would make it depend on how many origin stops an operator has.

What this figure is made of

Three disclosures travel with every number on this page. For some operators they are not decoration — they are the whole finding.

DisclosureShareWhat it means
Confirmed98.83%The share of counted arrivals for which an arrival event fired (REAL). The rest is a forecast — which says something about a stop's equipment, not about whether the vehicle came.
Restated as timetable0.54%The share of what could have been measured that was removed because the forecast was the scheduled second exactly. A denominator that lost a fifth of itself is a different statement from one that lost nothing.
Confirmed and exactly on plan1.38%The share of confirmed arrivals filed at exactly the scheduled second. Disclosed and deliberately not removed: no rule in this project reaches this case.

Only 10 of the 11 months in this period carry figures. The figure above is counted over those 10 and not over the whole period.

The months inside this period

The figure above is counted over the whole period. A single month inside it can have quite different coverage — and one that is below the floor on its own disappears into a period figure that clears it.

MonthShareCoverageConfirmedRestated as timetableConfirmed and exactly on plan
January 202586.43%98.72%98.15%1.28%1.64%
February 202585.78%99.31%98.09%0.66%1.57%
March 202582.64%98.59%98.51%0.72%1.32%
April 202583.61%99.75%99.51%0.01%1.45%
May 202577.94%99.88%99.09%0.01%1.25%
June 202580.51%97.68%99.46%0.7%1.33%
July 202588.76%98.89%99.59%0.58%1.32%
August 202586.03%99.74%99.66%0.11%1.46%
October 202584.8%99.23%98.13%0.17%1.47%
November 202573.72%99.19%98.5%0.09%1.09%

Rows with no share are below the 90% floor on their own. The figure above stands: it is measured over the whole period and it clears the floor. Both are true, and only one of them used to be on this page.

Nothing was reported under this line key in these months: September 2025

Trend — Timetable period 2026

The current timetable period, month by month. Each month is counted on its own; these rows do not add up to the figure above and are not meant to.

MonthShareCoverageConfirmedRestated as timetableConfirmed and exactly on plan
January 202680.44%97.44%97.67%2.47%1.17%
February 202681.76%96.25%98.08%0.4%1.29%
March 202679.91%99.52%97.63%0.41%1.26%
April 202682.69%99.62%97.92%0.04%1.33%
May 202678.68%99.49%98.06%0.11%1.13%
June 202672.9%99.16%98.15%0.18%0.94%
July 202684.35%96.22%97.14%3.66%1.27%
August 202679.61%99.66%98.48%0.07%1.18%
September 202672.34%99.2%99.13%0.04%1.07%
October 2026not published3.23%95.58%2.42%1%

Every row carries its own coverage. A month below the floor publishes no share — the three columns on the right still say why.

Not measured yet — these months are after the archive's most recent one: November 2026

By hour of day

When an hour starts decides more about punctuality than almost anything else measured here.

Over the last 365 days in the archive, not the timetable year above — so the grid shows the hours as they run now.

October 2, 2025 – October 1, 2026

HourMonTueWedThuFriSatSunStop events counted
05:0099.42%98.46%98.63%98.52%99.65%nothing measurednothing measured4'468
06:0098.79%99.08%99.31%98.82%98.9%95.83%92.67%40'801
07:0095.23%95.44%95.36%94.48%96.89%99.44%94.42%57'020
08:0087.71%84.48%89.63%83.83%88.45%95.49%98.01%52'983
09:0083.44%73.03%80.73%77.18%78.25%83.1%95.75%50'710
10:0078.83%65.33%67.01%69.42%72.29%78.29%91.88%51'976
11:0067.71%60.13%65.07%69.17%62.21%64.79%90.46%51'977
12:0067.78%67.12%63.16%69.82%58.08%59.19%89.72%52'147
13:0062.95%62.69%70.54%62.59%61.59%76.22%86.09%52'435
14:0069.62%69.91%63.88%69.48%65.4%65.56%84.22%52'135
15:0064.37%62.46%58.15%62.87%59.4%70.54%79.52%55'526
16:0081.92%76.55%79.84%75.31%73.64%69.75%74.52%60'987
17:0077.21%77.37%78.02%73.14%75.69%68.66%76.07%61'601
18:0087.86%85.44%85.27%81.74%78.89%73.39%74.33%57'592
19:0086.81%81.15%77.9%78.06%68.02%70.56%86.57%41'084
20:0089.91%83.23%82.73%80.73%70.13%82.11%84.62%37'438
21:0092.44%86.89%87.25%85.55%80.63%86.58%88.13%37'388
22:0094.47%96.68%92.2%92.61%88.7%92.43%91.79%37'571
23:0097.21%95.78%96.06%93.83%92.32%94.33%96.81%26'294
00:00 (+1)100%100%100%99.17%94.34%96.17%nothing measured1'582

The outlined cell is that day’s worst hour — it is not the same hour on every day.

Service day, not calendar day: hour 24 is 00:00–00:59 the following morning and still belongs to the day before.

An hour's coverage is the measurement axis alone. The figure at the top of this page takes the worst of three axes — days, journeys, measurements — and so rests on more evidence than these rows do.

About this line

Line key85:876:202
Label202
OperatorTransports publics Vevey-Montreux-Chillon-Villeneuve
Modebus

The line registry is built from one week of June 2026. Lines that did not run in that week have no name here — they are measured all the same.

Source and method

Source of the measurements: opentransportdata.swiss (istdaten). How we measure is written up in the methodology.

A figure is published only from 90% coverage upward. Below it there is no figure here — not a greyed-out one, not a dash, none.