Skip to contentBePünktli

918 (Küsnacht ZH, Gartenstrasse – Küsnacht ZH, Bahnhof)

Line 85:849:918 · Verkehrsbetriebe Zürich · bus


Timetable period 2025

The published figure is the most recently completed timetable period. The current one is below it as a trend — month by month, and never folded into a single figure: nothing is averaged across a timetable change.

December 8, 2024 – December 13, 2025

93.89% — less than 3:00 late, coverage 98.96% (floor 90%)

ThresholdShareCoverageStop events counted
under 3:0093.89%98.96%66'886
under 5:0098.84%98.96%66'886
under 15:0099.23%98.96%66'886

Distribution of delays

MeasureValue (min:s)
Median1:08
90th percentile2:32
95th percentile3:03
Measured arrivals66'378

The 3:00 threshold can see none of what happens beyond it: nine arrivals in ten are under 2:32.

Cancellations and early departures

MeasureShareCoverage
Ran rather than cancelled99.24%98.96%
Departures not early99.9%98.96%

An early departure is one more than a minute ahead of the timetable. It has its own denominator — measured departures — because sharing the arrivals' one would make it depend on how many origin stops an operator has.

What this figure is made of

Three disclosures travel with every number on this page. For some operators they are not decoration — they are the whole finding.

DisclosureShareWhat it means
Confirmed98.03%The share of counted arrivals for which an arrival event fired (REAL). The rest is a forecast — which says something about a stop's equipment, not about whether the vehicle came.
Restated as timetable0.02%The share of what could have been measured that was removed because the forecast was the scheduled second exactly. A denominator that lost a fifth of itself is a different statement from one that lost nothing.
Confirmed and exactly on plan0.55%The share of confirmed arrivals filed at exactly the scheduled second. Disclosed and deliberately not removed: no rule in this project reaches this case.

The months inside this period

The figure above is counted over the whole period. A single month inside it can have quite different coverage — and one that is below the floor on its own disappears into a period figure that clears it.

MonthShareCoverageConfirmedRestated as timetableConfirmed and exactly on plan
January 202591.82%99.55%98.66%0%0.26%
February 202594.97%99.05%97.72%0%0.36%
March 202589.47%99.26%98.31%0%0.33%
April 202593.21%99.35%97.52%0%0.54%
May 202591.4%99.48%97.37%0%0.51%
June 202595.18%99.49%98.35%0%0.27%
July 202595.33%98.95%97.36%0%0.4%
August 202596.18%97.75%98.02%0%0.71%
September 202595.85%98.98%98.28%0%0.39%
October 202595.44%99.34%98.02%0%0.68%
November 202592.38%97.38%98.45%0%0.63%

Rows with no share are below the 90% floor on their own. The figure above stands: it is measured over the whole period and it clears the floor. Both are true, and only one of them used to be on this page.

Trend — Timetable period 2026

The current timetable period, month by month. Each month is counted on its own; these rows do not add up to the figure above and are not meant to.

MonthShareCoverageConfirmedRestated as timetableConfirmed and exactly on plan
January 202694.12%99.98%98.05%0%0.43%
February 202697.52%99.48%98.52%0%0.67%
March 202694.93%99.91%99.01%0%0.39%
April 202696.32%99.87%99.31%0%0.61%
May 202693.45%99.96%98.62%0%0.57%
June 202693.54%99.93%99.09%0%0.46%
July 202696.37%99.98%99.24%0%0.52%
August 202693.29%97.98%99.03%0%0.49%
September 202693.69%99.9%98.82%0%0.63%

Every row carries its own coverage. A month below the floor publishes no share — the three columns on the right still say why.

Not measured yet — these months are after the archive's most recent one: October 2026, November 2026

By hour of day

When an hour starts decides more about punctuality than almost anything else measured here.

Over the last 365 days in the archive, not the timetable year above — so the grid shows the hours as they run now.

October 1, 2025 – September 30, 2026

HourMonTueWedThuFriSatSunStop events counted
06:00100%100%99.68%100%100%nothing measurednothing measured2'972
07:0094.21%88.39%90.02%93.75%95.17%98.34%nothing measured4'570
08:0091.99%89.55%93.21%90.76%94.38%99.14%nothing measured4'788
09:0098.24%97.55%94.76%95.81%97.1%99.14%nothing measured4'786
10:0099.5%94.99%96.08%93.51%92.02%96.8%nothing measured4'803
11:0098.49%93.26%88.42%92.46%90.14%93.59%nothing measured4'796
12:0089.28%84.57%90.13%82.23%82.48%93.6%nothing measured4'785
13:0098.11%98.3%94.57%94.37%98.03%95.43%nothing measured4'783
14:0097.86%98.05%91.51%97.25%96.73%97.16%nothing measured4'793
15:0092.6%85.28%92.95%92.21%86.55%98.38%nothing measured4'792
16:0095.72%88.54%91.46%90.46%94.11%94.53%nothing measured4'810
17:0093.33%91.71%93.2%93.16%95.82%96.67%nothing measured4'818
18:0099.25%98.05%97.13%97.8%98.56%97.04%nothing measured4'192
19:0098.75%98.64%99.88%98.84%99.21%nothing measurednothing measured3'983
20:0099.67%100%99.84%98.97%99.47%nothing measurednothing measured2'996

The outlined cell is that day’s worst hour — it is not the same hour on every day.

Service day, not calendar day: hour 24 is 00:00–00:59 the following morning and still belongs to the day before.

An hour's coverage is the measurement axis alone. The figure at the top of this page takes the worst of three axes — days, journeys, measurements — and so rests on more evidence than these rows do.

About this line

Line key85:849:918
Label918
OperatorVerkehrsbetriebe Zürich
Modebus

The line registry is built from one week of June 2026. Lines that did not run in that week have no name here — they are measured all the same.

Source and method

Source of the measurements: opentransportdata.swiss (istdaten). How we measure is written up in the methodology.

A figure is published only from 90% coverage upward. Below it there is no figure here — not a greyed-out one, not a dash, none.