An earlier spelling This line is now recorded under a different key: 885 (Schnottwil, Post – Lohn-Lüterkofen, Bahnhof). The figures on this page cover the time before the change; the later ones are on the other page. Neither page holds the whole history.
885 (Schnottwil, Post – Lohn-Lüterkofen, Bahnhof)
Line 85:801:807 · PostAuto AG · bus
Timetable period 2025
The published figure is the most recently completed timetable period. The current one is below it as a trend — month by month, and never folded into a single figure: nothing is averaged across a timetable change.
December 8, 2024 – December 13, 2025
Coverage insufficient
We publish no figure here
Too little of what the timetable said could be measured actually was. From 90% coverage upward a number appears here again.
coverage 4.36% — floor 90%
| Threshold | Share | Coverage | Stop events counted |
|---|---|---|---|
| under 3:00 | not published | 4.36% | nothing measured |
| under 5:00 | not published | 4.36% | nothing measured |
| under 15:00 | not published | 4.36% | nothing measured |
Cancellations and early departures
| Measure | Share | Coverage |
|---|---|---|
| Ran rather than cancelled | not published | 4.36% |
| Departures not early | not published | 4.36% |
An early departure is one more than a minute ahead of the timetable. It has its own denominator — measured departures — because sharing the arrivals' one would make it depend on how many origin stops an operator has.
What this figure is made of
Three disclosures travel with every number on this page. For some operators they are not decoration — they are the whole finding.
| Disclosure | Share | What it means |
|---|---|---|
| Confirmed | 0% | The share of counted arrivals for which an arrival event fired (REAL). The rest is a forecast — which says something about a stop's equipment, not about whether the vehicle came. |
| Restated as timetable | 94.81% | The share of what could have been measured that was removed because the forecast was the scheduled second exactly. A denominator that lost a fifth of itself is a different statement from one that lost nothing. |
| Confirmed and exactly on plan | nothing measured | The share of confirmed arrivals filed at exactly the scheduled second. Disclosed and deliberately not removed: no rule in this project reaches this case. |
The months inside this period
The figure above is counted over the whole period. A single month inside it can have quite different coverage — and one that is below the floor on its own disappears into a period figure that clears it.
No months of this timetable period are available yet.
Nothing was reported under this line key in these months: January 2025, February 2025, March 2025, April 2025, May 2025, June 2025, July 2025, August 2025, September 2025, October 2025, November 2025
Trend — Timetable period 2026
The current timetable period, month by month. Each month is counted on its own; these rows do not add up to the figure above and are not meant to.
No months of this timetable period are available yet.
Nothing was reported under this line key in these months: January 2026, February 2026, March 2026, April 2026, May 2026, June 2026, July 2026, August 2026, September 2026
Not measured yet — these months are after the archive's most recent one: October 2026, November 2026
By hour of day
Over the last 365 days in the archive, not the timetable year above — so the grid shows the hours as they run now.
October 1, 2025 – September 30, 2026
No hour in this period has enough behind it to publish.
About this line
| Line key | 85:801:807 |
|---|---|
| Label | 885 |
| Operator | PostAuto AG |
| Mode | bus |
| Recorded today as | 85:801:1485 |
A line key changes when an operator renumbers its lines or the timetable issues new identifiers. Only a succession the registry has accepted is linked here — a proposed one is not.
The line registry is built from one week of June 2026. Lines that did not run in that week have no name here — they are measured all the same.
Source and method
Source of the measurements: opentransportdata.swiss (istdaten). How we measure is written up in the methodology.