Skip to contentBePünktli

M4 (Genève-De-Châteaubriand (lac) – Genève-Port Noir (lac))

Line 85:199:SMGNM4 · Mouettes genevoises SA · boat


Punctuality

Not yet published

Analysis to follow

Boat, cogwheel and metro are ingested but not yet analysed. That is deliberate, not a fault.

Modes affected: boat

Boat, cogwheel and metro are ingested and stored but not yet analysed. This page therefore leaves the figures out and says so — silently omitting a mode would be the same defect as silently guessing a line.

About this line

Line key85:199:SMGNM4
LabelM4
OperatorMouettes genevoises SA
Modeboat

The line registry is built from one week of June 2026. Lines that did not run in that week have no name here — they are measured all the same.

Source and method

Source of the measurements: opentransportdata.swiss (istdaten). How we measure is written up in the methodology.

A figure is published only from 90% coverage upward. Below it there is no figure here — not a greyed-out one, not a dash, none.